Preparing for Trafinox installation

A handover checklist for kitchen studios, worktop suppliers and installers. Confirm product details and responsibilities before machining the worktop.

Good installation preparation starts with one clear product dossier. Make sure the kitchen studio, worktop supplier and installer use the same article code, version and installation information. This checklist supports coordination; the instructions and drawing for the exact article govern the installation.

1. Record the article and version

Select the product in the Trafinox range. Record the full article code, product name, colour or finish and number of bowls. Include the order or project specification so that an abbreviation on a drawing does not lead to a different article.

On delivery, check that the received article and its label match the dossier. Report a mismatch or visible damage before the product is processed. Keep packaging and article details available for assessment.

2. Confirm the mounting method and correct drawing

Record whether the article will be inset, undermounted or flush-mounted, and confirm that the chosen version supports that method. Request the corresponding drawing or manual. Do not use bowl dimensions, general overall dimensions or a similar model drawing as a cutting specification.

Use technical documents and downloads to find available product documents or request missing information. Record the date or revision and confirm which drawing has been approved for the project.

3. Assess the cabinet, worktop and fixings together

Compare the stated minimum cabinet width with the actual cabinet arrangement. Include side panels, drawers, hinges and the depth below the worktop. Ask the worktop supplier to assess whether the material, thickness, edge finish and support suit the chosen mounting method.

Check which fixings are included and which additional components the installation instructions require. Record who supplies them and who carries out fitting and sealing. This prevents the fixing arrangement from being decided only during installation.

4. Include the tap, overflow and waste layout

Include the exact tap and waste components in the dossier. Check the tap-hole position, clearance for the controls and any pull-out hose. Allow space for the overflow, trap, connections and access to components.

Do more than draw a bin, drawer or appliance as a rectangle on a sketch. Check its movement and connection space too. Have the components assessed together when a proposed combination differs from the documented arrangement.

5. Make the handover checkable

  • Full article codes and versions of the sink, tap and waste components.
  • Confirmed mounting method and the corresponding dated or revised drawing.
  • Worktop material, cabinet arrangement and checked connection positions.
  • Required fixings and responsibility for supply, machining and installation.
  • Outstanding questions, contact person and confirmation before machining starts.

Mark any unconfirmed dimension or version as an open item in the dossier. Redistribute a changed drawing to every party involved; an earlier revision should not remain the working basis unnoticed.

Need clarification before installation?

Contact Trafide with the article code, drawing revision and a specific description of the situation. Consult the Trafinox warranty statement for applicable product conditions. This checklist does not replace those conditions or the installation instructions.